期刊文献+

新建1000MW火电机组补给水系统可行性研究

Feasibility study on feedwater system of new-built 1000 MW thermal power units
下载PDF
导出
摘要 通过对国华徐州电厂现有锅炉补给水处理系统的产水量标定、产水水质测定、设备状态评估以及经济性评价,全面论证了将它用于现有2×220MW机组和新建2×1000MW机组的可行性,并提出了设备改造和系统优化方案。 Through the analysis of the water production demarcation, water quality determination, equipment status evaluation and economic estimation of the feedwater treatment system of the boiler currently used in Guohua Xuzhou power generation Co., Ltd., the feasibility of using the said system in 2 × 220 MW thermal power units and new-built 2 × 1 000 MW units was demonstrated, and the schemes for equipment reconstruction and system optimization were also put forward.
出处 《工业用水与废水》 CAS 2010年第1期22-24,共3页 Industrial Water & Wastewater
关键词 锅炉补给水处理 超超临界机组 系统优化 经济性分析 可行性研究 boiler feedwater treatment uhra-supercritical units system optimization economic estimation feasibility study
  • 相关文献

参考文献3

  • 1DL/T912-2005,超临界火力发电机组水汽质量标准[S].
  • 2DL/T5068-2006,火力发电厂化学设计技术规程[S].
  • 3DL543-94,水处理设备质量验收标准[S].

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部