期刊文献+

膏溶角砾岩地层大断面隧道快速施工技术 被引量:6

Technology for Rapid Construction of Large Cross-section Tunnel in Gypsum Breccia Ground
下载PDF
导出
摘要 通过施工方法比选,确定能在膏溶角砾岩地层实现安全、快速施工的台阶法方案,并通过优化实施施工工艺、确定台阶长度、分析确定最佳开挖进尺、各施工工序间的合理距离,实行同步作业、分区钻孔、分区装药等手段,实现大断面隧道的快速施工。对软岩条件下的大断面隧道的快速施工具有较好的实用性。 "Top heading + bench" method, which is capable of ensuring safe and rapid tunnel construction in gypsum breccia ground, is adopted for Taihangshan tunnel after analysis on different construction methods. Rapid tunnel construction is achieved by taking various measures, such as optimizing the implementation of the construction process, analyzing and determining proper bench length, optimum excavation advance rate and reasonable distance between different construction processes and implementing parallel working, partitioned borehole drilling and partitioned charging. The paper can be served as reference for the rapid construction of large cross-section tunnels in soft ground in the future.
出处 《隧道建设》 2010年第1期44-47,62,共5页 Tunnel Construction
基金 中铁隧道集团有限公司技术科研项目(隧研合2005-21)
关键词 膏溶角砾岩 大断面隧道 工艺优化 快速施工 gypsum breccia large cross-section tunnel construction process optimization rapid construction
  • 相关文献

参考文献9

二级参考文献18

共引文献72

同被引文献34

引证文献6

二级引证文献95

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部