大型工程项目集成化管理环境下的知识协同与任务调度 被引量:1

Knowledge cooperation and project scheduling of large-scale engineering project under integrated management conditions
下载PDF
导出
摘要 将各个项目单元抽象为不同的知识源,详细分析了集成化管理环境下的知识协同问题,提出了基于权威性加权原则的知识协同处理策略,并就策略修正、协同求解等问题作了分析说明。在此基础上,采取前向调度算法和逆向调度算法相结合的迭代算法,建立了协同工作中的任务调度模型,算例证明,模型能够有效满足各约束条件下任务的增删需求。 During the execution of a large-scale engineering project, the integrated management has become an effective method increasing the operation efficiency. A systematic analysis of the strategies for knowledge cooperation under integrated management conditions was carried out. An amendment of this cooperation and operation of this cooperation was also discussed. Furthermore, based on the com- bination of forward scheduling algorithm and backward scheduling algorithm, a new mode of project scheduling was put forward. Finally, an illustration was used to prove the correctness of mathematic mode, and some proposals were made for the application of integrated management.
出处 《海军工程大学学报》 CAS 北大核心 2010年第1期91-96,106,共7页 Journal of Naval University of Engineering
关键词 集成化管理 大型工程项目 知识协同 任务调度 integrated management large-scale project knowledge cooperation project scheduling
  • 相关文献

参考文献10

二级参考文献39

  • 1秦书生.论复杂性工程观[J].系统科学学报,2007,15(1):97-100. 被引量:5
  • 2TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993.
  • 3KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172.
  • 4TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340.
  • 5SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102.
  • 6LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379.
  • 7OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407.
  • 8TORMOS P,LOVA A. An efficient multi-pass heuristic for project scheduling with constrained resources[J].International Journal of Production Research, 2003, 41(5):1071-1086.
  • 9[1]Blazewicz J, Leastra J K, Kan A H G R. Scheduling subject to resource constraints:classification and complexity. Discrete Applied Mathematics, 1983, 5:11~24
  • 10[2]Downlatshahi S, Ashok M S. Design optimization in concurrent engineering:a team approach. Concurrent Engineering-Research and Applications, 1997, 5:145~154

共引文献100

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部