焦化废水处理工程实例 被引量:2

PROJECT EXAMPLE OF COKING WASTEWATER TREATMENT
下载PDF
导出
摘要 介绍了青海省某焦化厂生产生活废水处理工程的工艺参数、调试过程和运行效果。该工程设计处理能力为960m.3d-1。采用A2/O2、混凝沉淀、过滤、氨吸附工艺处理。出水水质指标达到并高于污水综合排放标准(GB8978-1996),其中部分出水回用于生产和喷洒路面和草坪。 he craft parameter, debugging process and operation effect of coking wastewater and domestic sewage in a certain coking and chemistry plant of Qinghai Province were introduced. The designed handling capacity is 960 m^3·d^-1. The wastewater was treated by A^2/O^2, coagulation and sedimentation, filter, the ammonia absorption. The water quality was over secondary standard ofwastewater discharge standards(G B8978- 1996). Part of the water reused in the production and back to the road and lawn sprinkler.
出处 《水处理技术》 CAS CSCD 北大核心 2010年第3期128-132,共5页 Technology of Water Treatment
关键词 焦化废水 生化法 A^2/O^2 混凝沉淀 coking wastewater biochemical process A^2/O^2 coagulation and sedimentation
  • 相关文献

参考文献6

二级参考文献48

共引文献136

同被引文献25

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部