海域环境影响对比分析在铁矿石港竣工环保验收中的应用 被引量:3

Contrastive Analysis Sea Area Environmental Charaterisitics for Completion Acceptance of Ironstone Harbour Environmental Protection
下载PDF
导出
摘要 通过对马迹山矿石中转港扩建工程竣工环境保护验收阶段在码头前沿区、锚地、航道和对照点处,海水水质、海洋表层沉积物、海洋生物的监测调查数据,进行与环评时期的阶段对比和各监测点之间的区域对比评价,分析工程竣工后对周边海洋生态环境的影响。以对比分析结果为基础,判断工程是否具备竣工环保验收条件。 By the monitoring data which water quality, deposites and planktons in dockside, anchorage, channel and contrast point at completion acceptance of Majishan ironstone transfer harbour expansion project environmental protection, to contrastive evaluate between the stage of the EIA and the monitoring places, the authors analysed the effects of project complention on environmental characteristics of sea area. In contrast to the results of the analysis, based on their ability to meet the project to determine the conditions of completion acceptance.
出处 《环境科学与管理》 CAS 2010年第2期66-69,74,共5页 Environmental Science and Management
关键词 竣工验收 海域影响 海洋生态 铁矿石港 completion acceptance sea impact marine ecology ironstone harbour
  • 相关文献

参考文献4

二级参考文献7

共引文献15

同被引文献7

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部