摘要
针对7.63 m碳化室焦炉下喷管安装工程的施工难点,以首钢京唐钢铁联合有限公司7.63 m碳化室焦炉下喷管安装工程为例,详细介绍了该碳化室焦炉下喷管施工技术,从而较好地保证施工质量的要求。
According to the construction difficulties in gas below spout installation works of coke oven with 7.63 m carbonization chamber, in this paper taken gas below spout installation works of coke oven with 7.63 m carbonization chamber in Jingtang unite steel Co. Ltd. as example the construction technology of gas below spout in this kind of coke oven is introduced in detail, which well ensure the requirements of construction quality.
出处
《山西建筑》
2010年第9期131-132,共2页
Shanxi Architecture
关键词
碳化室
焦炉
安装工程
下喷管
测量网格
控制框架
carbonization chamber, coke oven, installation engineering, gas below spout, measurement grid, control frame