摘要
以福建省浦南高速公路稀浆封层施工过程中的质量控制情况为例,介绍了ES-2改性乳化沥青稀浆封层对原材料、混合料级配设计、施工工艺等方面的要求和控制方法,进一步为稀浆封层施工提供指导。
Taking the quality control of the slurry seal construction process of Pu-Nan expressway in Fujian as an example, the paper introduces ES-2 modified emulsion asphalt's requirement and controlling method on the raw materials, the mixer grade design and construction craft, so as to provide direction to the slurry seal construction.
出处
《山西建筑》
2010年第9期286-287,共2页
Shanxi Architecture
关键词
稀浆封层
原材料
下封层
slurry seal, raw materials, lower sealant