期刊文献+

赫章特大桥方案设计 被引量:2

Scheme design of Hezhang super large Bridge
下载PDF
导出
摘要 根据桥址处的地形、地貌、地质、水文、气象的要求,赫章特大桥推荐方案主桥采用(96+2×180+96)m预应力混凝土连续刚构桥,比较方案主桥采用(140+322+140)m预应力混凝土斜拉桥,着重介绍了大桥的结构构思、桥型、桥墩及基础结构形式的选择。 According to the requirements of terrain, landforms, geology, hydrology and meteorology in the site of bridge prestressed concrete continuous rigid frame bridge (96 + 2 × 180 + 96)m is recommended for main beam scheme of Hezhang super large Bridge. The other compara- tive scheme prestressed concrete cable-stayed bridge (140 + 322 + 140)m is also mentioned. In the end structural design concept, selection of bridge shape, pier and types of abutment are mainly introduced for Hezhang super large Bridge.
出处 《山西建筑》 2010年第9期319-320,共2页 Shanxi Architecture
关键词 连续刚构桥 斜拉桥 预应力 桥梁设计 continuous rigid flame bridge, cable-stayed bridge, prestress, bridge design
  • 相关文献

参考文献1

  • 1JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,..

共引文献1843

同被引文献1

  • 1范立础.桥梁工程[M].北京:人民交通出版社,1996..

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部