摘要
介绍平煤集团六矿矸石山绞车原电控系统存在的问题,提出了对原电控系统采用开关磁阻电机和PLC相结合改造矸石山绞车系统的办法,达到消除故障、安全生产,提高生产效率的目的。
Describes PingInei Group No.6 Mine waste dump winch electric control system of the original problems proposed to the original electronic control system uses the switched reluctance motor and PLC integrated approach to transforming waste dump winch system to achieve elimination of failure, safety in production, improve production efficiency.
出处
《煤矿机械》
北大核心
2010年第3期172-173,共2页
Coal Mine Machinery