期刊文献+

世博期间轨道交通客流特征研究 被引量:2

Study of Rail transit Passenger Flow Features in Duration of 2010 Shanghai Expo
原文传递
导出
摘要 轨道交通是世博客流集约组织的主体,拟分担50%的世博客流。由于开闭园时间确定为9:00-24:00,可能出现世博游客入园高峰与日常工作客流高峰相叠加的情况。为客观评价世博期间的轨道交通服务水平,以2010年工作日、节假日背景的轨道交通客流特征为研究基础,分析了不同世博客流规模对该时段轨道交通网络的影响,并提出轨道交通组织保障建议。 Rail transit, the backbone of intensive operation on Shanghai EXPO passenger flow, will share Shanghai EXPO passenger flow by 50 percent. It will occur the overlap between entrance peak and working peak because Shanghai EXPO opening and closing time will be 9 a. m to 24 p. m. To assess objectively service level of rail transit in duration of Shanghai EXPO, the effect of passenger flow scale in duration of workday and vacation in 2010 on rail transit network is analyzed on basis of flow transit passenger flow feature. And the arrangement and security on rail transit are suggested.
作者 邵丹
出处 《上海建设科技》 2010年第1期8-9,22,共3页 Shanghai Construction Science & Technology
关键词 世博交通 轨道交通 运营组织 EXPO transport rail transit running arrangement
  • 相关文献

参考文献4

  • 1上海市城市综合交通规划研究所,世博交通研究中心.世博交通研究阶段工作成果[R].上海市城市综合交通研究所,2009.
  • 2上海世博会事务协调局交通管理部,上海市城市综合交通规划研究所.上海世博交通需求整合与修编研究[R].上海市城市综合交通研究所,2008.
  • 3上海市城乡建设和交通委员会,上海市城市综合交通规划研究所.上海世博交通保障行动方案[R].上海市城市综合交通研究所,2006.
  • 4上海世博会事务协调局交通管理部,上海市城市综合交通规划研究所.世博园区周边交通特征调查报告[R].上海市城市综合交通研究所,2007.

同被引文献20

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部