摘要
通过对罗泾港区二期工程干散货、钢杂货的接卸、中转和后方钢厂特殊需求的装卸工艺系统方案的研究,提出了一个集矿石、煤炭和钢杂码头装卸工艺于一体的又有个性化的装卸新工艺,为装卸工艺系统的优化设计提供依据,为罗泾港区二期工程的顺利实施提供技术支撑。
Through studying on loading- unloading and transferring of dry bulk cargoes and general steel cargoes and the cargo - handling technology system plan which satisfies the special requests of the rear steel plant in Luojing Terminal ( Phase 2 ), this paper puts forward a new individualized handling technology which converges the handling technologies of ore, coal and general steel cargoes terminal as a whole. It provides a basis for optimal designing of handling technology system, offers technical supports to the smooth implementation of Luojing Terminal ( Phase 2 )