期刊文献+

罗泾港区二期工程装卸工艺方案研究 被引量:2

Research on Cargo-Handling Technology Plan of Shanghai Port Luojing Terminal(Phase 2)
下载PDF
导出
摘要 通过对罗泾港区二期工程干散货、钢杂货的接卸、中转和后方钢厂特殊需求的装卸工艺系统方案的研究,提出了一个集矿石、煤炭和钢杂码头装卸工艺于一体的又有个性化的装卸新工艺,为装卸工艺系统的优化设计提供依据,为罗泾港区二期工程的顺利实施提供技术支撑。 Through studying on loading- unloading and transferring of dry bulk cargoes and general steel cargoes and the cargo - handling technology system plan which satisfies the special requests of the rear steel plant in Luojing Terminal ( Phase 2 ), this paper puts forward a new individualized handling technology which converges the handling technologies of ore, coal and general steel cargoes terminal as a whole. It provides a basis for optimal designing of handling technology system, offers technical supports to the smooth implementation of Luojing Terminal ( Phase 2 )
作者 吴福华
出处 《港口科技》 2010年第2期9-13,共5页 Port Science & Technology
关键词 港口 工程 钢杂货 装卸工艺 port engineering general steel cargo handling technology
  • 相关文献

同被引文献6

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部