潮汐电站浮运法施工技术综述 被引量:3

Floating caisson Construction Method of Tidal Power Plant
下载PDF
导出
摘要 在潮汐电站建设中,浮运法施工起着降低造价,缩短工期,改善施工条件等重要作用。本文简要介绍潮汐电站浮运法施工各阶段(预制,拖运,地基处理,沉放)的关键技术,包括选择预制场,控制拖运,开挖和地基加固,定位和安放沉箱等。浮运法施工技术在河床式水电站、码头、海上采油平台、过江(海底)隧道、桥梁、水闸等工程中也有广泛的应用前景。 In the construction of tidal power plants,the floating caisson method may reduce the cost shorten the construction period,and improve construction conditions.This paper introduces briefly the crucial technology of the method including the selection of precasting yards,controlling of the towing,excavation and treatment of foundation,locating and placing of caissons.The floating caisson construction method can also be applied to river channel power stations,ports,offshore drilling platforms,subaqueous tunnels,bridges,locks,etc.
机构地区 河海大学
出处 《水利水电科技进展》 CSCD 1998年第6期17-20,共4页 Advances in Science and Technology of Water Resources
关键词 潮汐电站 浮运法 沉箱 施工技术 水电站 tidal power plant floating caisson construction concrete block caisson
  • 相关文献

同被引文献25

引证文献3

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部