长输管道工程施工现场设计配合工作方法初探 被引量:1

PRIMARY RESEARCH OF THE METHODS OF ON-SITE TECHNICAL SUPPORT IN CROSS-COUNTRY TRANSMISSION PIPELINE ENGINEERING
下载PDF
导出
摘要 长输管道工程线路长、专业面广、工作界面交叉多、施工周期控制严格,因此,做好施工现场的设计配合工作具有重要的现实意义。针对长输管道的上述特点,分析了施工现场设计配合工作的意义。在此基础上,梳理、研究了施工现场设计配合工作存在的普遍问题。同时,结合中石化川气东送天然气管道工程施工现场设计配合工作实践,提出了解决问题、提高施工现场设计配合工作质量的可行措施。对今后天然气管道建设中的设计配合工作具有一定的参考价值。 According to the characteristics of cross-country transmission pipeline engineering, such as long route, diverse discipline, a large amount of working interface crosses, strict control of construction periods etc., this article analyzes the sense of technical support work in construction field. On this basis, the paper sets and researches the matters that commonly present in technical support work in construction field. And in combination with the practice of the technical support work in construction field in Gas Transmission Pipeline Engineering from Sichuan to Shanghai, it puts forward some available measures to solve the problems and improve the quality of the technical support work in construction field, which can provide the reference to the engineering alike.
作者 申祥波
出处 《中国勘察设计》 2010年第2期60-63,共4页 China Engineering Consulting
关键词 长输管道 设计配合 项目管理 cross-country transmission pipeline technical support work project management
  • 相关文献

同被引文献3

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部