基于约束的CPM动态优化算法 被引量:6

Dynamic CPM optimal algorithm based on constraints
原文传递
导出
摘要 利用基于蒙特卡罗模拟的关键路径(CPM)优化算法模型,通过分析项目计划中各任务之间可能存在工序约束和期限约束对CPM的影响,提出了基于约束的CPM动态优化算法.该算法可得到CPM,工期及其统计特性和相关的冲突信息,为决策者提供更好的决策信息支持.采用Matlab,C#和SQL Server实现了所提出算法,实例分析验证了该算法的有效性. A dynamic critical path method(CPM) optimal algorithm base on constraints of scheduling network plan is proposed by using the CPM optimal algorithm model based on Monte Carlo simulation,and the constraints including actives sequence constraints and date limitation constraints are considered together with CPM. CPM,duration,information of related conflicts and their statistic characteristic are obtained,which is helpful to improve the decision support. Matlab,C# and SQL Server 2000 are utilized to implement proposed algorithm. The realistic case study shows the effectiveness of proposed algorithm.
出处 《控制与决策》 EI CSCD 北大核心 2010年第2期166-170,共5页 Control and Decision
关键词 网络计划图 关键路径方法 工序约束 期限约束 蒙特卡罗模拟 Scheduling network plan Critical path method Work sequence constraints Date limitation constraints Monte Carlo simulation
  • 相关文献

参考文献15

  • 1马国丰,陈强.项目进度管理的研究现状及其展望[J].上海管理科学,2006,28(4):70-74. 被引量:54
  • 2张杰,李原,张开富,杨海成.项目管理中进度调整的模糊动态规划方法[J].计算机集成制造系统,2006,12(8):1258-1262. 被引量:13
  • 3Chen S P. Analysis of critical paths in a project network with fuzzy activity times[J]. European J of Operational Research, 2007, 183(1):442-459.
  • 4Kurihara K, Nishiuchi N. Efficient Monte Carlo simulation method of GERT-type network for project management[J]. Computers & Industrial Engineering, 2002, 42(2): 521-531.
  • 5Shipley M F, Korvin A, Omer K. Bifpet methodology versus PERT in project management: Fuzzy probability instead of the beta distribution[J]. J of Engineering and Technology Management, 1997; 14(1): 49-65.
  • 6Chanas S. Zielinski P. Critical path analysis in the network with fuzzy activity times[J]. Fuzzy Sets and Systems, 2001, 122(2): 195-204.
  • 7Ragsdale C. The current state of network simulation in project management theory and practice [J]. Omegat, 1989, 17(1): 21-25.
  • 8Golddratt E M. Theory of constraints[M]. New York: North River Press, 1990.
  • 9Davies J, Mabin V J, Balderstone S J. The theory of constraints; A comparison of with selected OR/MS methodologies[J] . Int J of Management Science, 2005, 33(6) : 506-524.
  • 10Rahman S. Theory of constraints: A review of the philosophy and its applications[J]. Int J of Operations Production Management, 1998, 18(4): 336-355.

二级参考文献21

  • 1潘开灵 尹柳营.用制约因素理论指导企业技术进步[J].中国学术期刊文摘,1997,3(4).
  • 2杰克.吉多.成功的项目管理[M].北京:机械工业出版社,1992.269-292.
  • 3[2]D.L.Keefer,W.A.Verdini:Better Estimation of PERT Activity Time Parameters.Management Science,1993(39):1086~1091.
  • 4[4]Goldratt EM:Theory of Constraints.NY:North River Press,1990.
  • 5[5]Goldratt E.M:Critical Chain.NY:North River Press,1997.
  • 6[6]Newbold RC:Project Management in the Fast Lane:Applying the Theory of Constraints.Boca Raton,Florida:St,Lucie Press,1998.
  • 7[7]Chiu-Chi Wei,Ping-Hung Liu:Resource-constrained project management using enhanced theory of constraint[J].International Journal of Project Management.2002(20):561~567.
  • 8[8]Sood,Shailesh:Theory of constraints can change the way you manage your projects.Electronic Engineering Times,2002.
  • 9沈建民.国防高科技项目管理概论[M].北京:机械工业出版社,2003.
  • 10哈罗德·凯斯勒,杨爱华,杨磊.项目管理:计划、进度和控制的系统方法[M].北京:电子工业出版社,2002.

共引文献123

同被引文献43

引证文献6

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部