摘要 针对某型盾构机推进系统分别建立了考虑冗余驱动的机械系统动力学模型和单组液压系统的简化液压模型,在此基础上建立了盾构机整个推进系统的机液耦合模型,给出基于外载-减压阀阀口开度关系的系统状态判定方法。在MATLAB/Simulink环境下进行数值建模与仿真,分析极端工况下各组推进缸的载荷特性。结果表明,该方法能够有效评价推进系统状态,并可为盾构机异质岩土掘进时驱动力分配的控制提供依据。 First, a dynamics model of mechanical structure considering redundant drive of a shield tunneling machane was presented, then a simplified model of single group hydraulic system was built, further a hydraulic--mechanical coupling model of the whole thrust system was established, and a method based on the relationship between external load and pressure relief valve opening was adopted to judge system state. To analyze the characteristics of thrust cylinder groups under extreme load, numerical simulation was run in MATLAB/Simulink environment. Results show that this method judges the thrust system effectively and is dependable basis for drive distribution control when shield tunneling machine thrust in heterogeneous soil.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2010年第3期258-262,309,共6页 China Mechanical Engineering
基金 国家重点基础研究发展计划资助项目(2007CB714003400) 高等学校博士学科点专项科研基金资助项目(200802481113)
关键词 盾构机 推进系统 冗余驱动 机液耦合 堵停 shield tunneling machine thrust system redundant drive hydraulic--mechanical coupling blockage
  • 相关文献

参考文献7

二级参考文献14

  • 1龚秋明,赵坚,张喜虎.岩石隧道掘进机的施工预测模型[J].岩石力学与工程学报,2004,23(z2):4709-4714. 被引量:42
  • 2胡国良,龚国芳,杨华勇,余佑官.盾构掘进机推进液压系统压力流量复合控制分析[J].煤炭学报,2006,31(1):125-128. 被引量:19
  • 3胡国良,龚国芳,杨华勇.盾构掘进机土压平衡的实现[J].浙江大学学报(工学版),2006,40(5):874-877. 被引量:36
  • 4Sanio H E Prediction of the performance of disc cutters in anisotropic rock[J]. Int. J. of Rock Mech. and Mining Sci. and Geomech. Abs.,1985, 22(3): 153-161.
  • 5Roxborough F F, Phillips H R. Rock excavation by disc cutter[J]. Int.J. of Rock Mech. and Mining Sci. and Geomech. Abs., 1975, 12:361-365.
  • 6Copur H, Rostami J, Ozdemir L, et al. Studies on performance prediction of roadheaders based on field data in mining and tunneling projects[A]. In: Int. the 4th Mine Mechanization and Automation Symp[C]. Brisbane, Australia: [s. n.], 1997. 1-7.
  • 7Rostami R, Ozdemir L, Nilson B. Comparison between CSM and NTH Hard Rock TBM Performance Prediction Models[M]. Las Vegas, NV: Isdt., 1996.
  • 8Maidl B, Herrenknecht M, Anheuser L. Mechanized Shield Tunnelling[M]. Berlin: Ernst and John, 1996. 221-225.
  • 9HU G. L., GONG G. F., YANG H. Y., et ol. Electro-hy draulic control system of shield tunnel boring machine for simulator stand[C]//Proceedings of ICFP' 2005. Hangzhou: International Academic Publishers, 2005 : 94-99.
  • 10胡国民盾构模拟试验平台电液控制系统关键技术研究[D].杭州:浙江大学,2006.

共引文献116

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部