摘要
针对大坝电厂三期750kV升压站系统调试中遇到的主要问题,进行了系统分析、计算和二次回路改进,采取了相应措施排除系统的隐患,以提高系统运行的稳定性和可靠性。
Aiming at the main problems appearing in 750 kV boost substation debugging in the third period of construction project in Daba Power Plant, makes a series of improvement on the secondary loop and system analysis and calculation, takes related measures, tries to improve the stability and reliability of the power system operation.
出处
《宁夏电力》
2010年第1期27-31,共5页
Ningxia Electric Power
关键词
750
KV
升压站
电磁环网
系统联跳机组
750 kV
boost substation
electromagnetic ring network
system inter-trip units