期刊文献+

随机环境下模具企业车间负荷控制方法 被引量:7

Workload control approach for mould enterprises in stochastic production
下载PDF
导出
摘要 针对目前难以对模具车间生产进行有效控制的问题,建立了多级车间任务投放控制模型。首先,考虑任务工期和资源需求的不确定性,分析了任务投放策略,构建了负荷中心直接和间接负荷的计算方法;然后,针对负荷过载问题,分析了模具车间生产能力调整策略,进一步建立了外协任务优化选择模型,并设计了混合优化算法进行求解;最后,通过实例分析说明了所提方法的实用性。 It is difficult to control the mould workshop production effectively. To deal with this problem,a multi-level job release control model was proposed. Firstly,considering the uncertainties of the task durations and resource requirements,release strategies were analyzed. And the calculation approach of the direct and indirect workload of load centers was established. Then,from the perspective of the overload problems in the load centers,capacity adjustment strategies were analyzed. Furthermore,optimization model was constructed for selecting the subcontracting jobs. And hybrid optimization algorithm was designed to solve the optimization problem. Finally,an application example demonstrated the practicability of the approach.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第2期263-270,共8页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(50675039) 国家863计划资助项目(2006AA04Z132) 广东省自然科学基金资助项目(05200197) 广东省科技攻关资助项目(2004B10201030)~~
关键词 模具 负荷控制 任务投放 生产能力调整 混合优化算法 mould workload control job release capacity adjustment hybrid optimization algorithm
  • 相关文献

参考文献8

  • 1WIGHT O W. Input/output control: a real handle on lead times[J]. Production and Inventory Management, 1970, 11(3) :9-30.
  • 2KINGSMAN B G. Modelling input-output workload control for dynamic capacity planning in production planning systems [J]. International Journal of Production Economics, 2000, 68(1) :73-93.
  • 3STEVENSON M, HENDRY L C. Aggregate load-oriented workload control: a review and a re-classification of a key approach[J]. International Journal of Production Economics, 2006,104(30/31) :676-693.
  • 4BERGAMASCHI D, CIGOLINI R, PERONA M, et al. Order review and release strategies in a Job Shop environment:a review and a classification[J]. International Journal of Production Economics, 1997,35(2) : 399-420.
  • 5GAALMAN G, PERONA M. Workload control in job shops: an introduction to the special issue[J]. Production Planning & Control, 2002,13(7): 565-567.
  • 6SILVA C, ROQUE L, ALMEIDA A. MAPP--a Web-based decision support system for the mould industry[J]. Decision Support Systems, 2006,42 (2) : 999-1014.
  • 7彭杰,陈庆新,毛宁,伍岳.嵌入随机概率模型的模具项目模板及其应用[J].模具工业,2007,33(8):1-5. 被引量:8
  • 8HENRICH P, LAND M, GAALMAN G. Grouping machines for effective workload control[J]. International Journal of Production Economies,2006,104(1) : 125-142.

二级参考文献2

共引文献7

同被引文献63

  • 1何正文,贾涛,徐渝.求解资源约束项目调度问题的启发式算法综述[J].运筹与管理,2007,16(3):78-84. 被引量:15
  • 2廖仁,陈庆新,毛宁.模具虚拟企业项目调度遗传算法研究[J].计算机集成制造系统,2004,10(7):815-819. 被引量:11
  • 3李英杰,陈庆新,陈新度,陈新.多属性虚拟企业部分并行协商项目规划[J].计算机集成制造系统,2005,11(6):810-817. 被引量:18
  • 4彭杰,陈庆新,毛宁,伍岳.嵌入随机概率模型的模具项目模板及其应用[J].模具工业,2007,33(8):1-5. 被引量:8
  • 5JAHANGIRIAN M,ELDABI T, NASEER A,et al. Simulation in manufacturing and business: A review [J].European Journal of Operational Research,2010(203):1-13.
  • 6BONDAREV E,MUSKENS J,DEWITH P.Predicting real-time properties of component assemblies:a scenar- io-simulation approach[C].Euromicro Conference,2004(30): 4-40.
  • 7WU L H,CHEN X,CHEN X D,CHEN Q X.The research on proactive-reactive scheduling framework based on real-time manufacturing information[J].Materials Science Forum,2009,626:789-794.
  • 8AYTUG H,LAWLEY M,MCKAY K.Executing produc- tion schedules in the face of uncertainties: A review and some future directions[J].European Journal of Operational Research,2005(161):86-110.
  • 9DJAMILA O,SANJA P.A survey of dynamic scheduling in manufacturing systems[J].J Sched,2009(12):417-431.
  • 10VIEIRA G E,HERRMANN J W, LIN E.Analytical mod- els to predict the performance of a single machine sys- tem under periodic and event-driven rescheduling strategies[J].Intemational Journal of Production Research, 2000,38(8):1899-1915.

引证文献7

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部