贵州某电厂灰场渗漏研究 被引量:1

Study on the Leakage of Stack Field in a Power Plant of Guizhou
下载PDF
导出
摘要 贵州某电厂灰场位于河流左岸,离河最近距离仅20 m,灰场内岩溶发育。本文采用水量均衡法和地下水连通试验分析灰场地下水补排平衡关系。结果表明:灰场地下水向左岸饮用水源地排泄,并且接受河水补给,提出了既可以解决灰场渗漏,又能保证饮用水源地安全的防渗建议。 The power plant stack field located at a river left bank in Guizhou,it is only 20m to river for the shortest distance,and karst develops well.The paper used the groundwater balance method and connection exporiment to analyze the relation of groundwater supply and drainage on stack field.The results showed that the field groundwater excreted to the left bank which was a drinking water region,and accepted the river water supplies.The paper provided an effective proposal which not only processes leakage but also assures the security of water source area.
出处 《水资源与水工程学报》 2010年第1期135-136,144,共3页 Journal of Water Resources and Water Engineering
关键词 岩溶 灰场渗漏 水量均衡 连通试验 karst leakage of stack field water balance tracing experiment
  • 相关文献

参考文献3

二级参考文献3

  • 1中国科学院地质研究所岩溶研究组.中国岩溶研究[M].北京:科学出版社,1987..
  • 2杜长学 陈新华 刘兴云.平南赤泥堆场选址阶段工程、水文地质勘察报告[R].长沙:中国有色金属工业长沙勘察设计研究院,1993..
  • 3张乃兴,李伟,安立贵,黄春海.济南四大泉群水源地连通试验研究[J].山东师范大学学报(自然科学版),1998,13(4):408-412. 被引量:12

共引文献19

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部