摘要
凡是工程建设无论大小都离不开进度管理,进度目标的管理-控制直接关系到工程的形象和参建各方的经济利益,本文针对工程建设施工阶段进度管理,根据不同的管理角度,从计划编制、审批程序、控制措施和方法,到资料收集管理作了全面论述,文章简明扼要,实用性强,有抛砖引玉的引导作用,按文中介绍的原理和方法进行管理定能收到事半功倍的效果。
Engineering construction, regardless of their size, can not be separated from schedule management. Management-control of progress aim was directly related to project's image and economic benefits of all parties. Based on schedule management in construction phase and different manage- ment view, this paper gave a comprehensive discussion from plan organizing, approval procedure, control measures and methods to data collection and management. The article was brief, precise and practical to play a guiding role. We had obtained good results achieving good results with half effort by management according to principle and method in the article.
出处
《重庆建筑》
2010年第3期39-41,共3页
Chongqing Architecture
关键词
工程建设
施工阶段
进度管理
engineering construction
construction stage
schedule management