期刊文献+

基于模糊数学的拆除爆破施工安全评价方法 被引量:3

Safety Assessment of Demolition Blasting Based on Fuzzy Set Theory
下载PDF
导出
摘要 提出了影响拆除爆破施工安全的7个因素,再将这7个因素进一步分解,得到17个基本子因素。用层次分析法对这17个基本子因素的权重进行了赋值,反映了这些因素对拆除爆破安全的影响程度的差异。以模糊变换理论为基础,建立了安全模糊综合评判数学模型。根据最大隶属度原则,计算出工程项目的实际安全状况。 The seven factors that influence safety of demolition blasting are summarized, and then the seventeen basic factors are deduced by disassembling the seven factors. Analytical Hierarchy Process (AHP) is used to calculate the relative weights of the seventeen basic factors. Based on the theory of fuzzy transformation, the fuzzy comprehensive evaluation model is established. The safety status of the blasting project is figured out according to the principle of the biggest subject.
作者 李新建
机构地区 郑州大学
出处 《工业安全与环保》 北大核心 2010年第3期24-25,共2页 Industrial Safety and Environmental Protection
关键词 拆除爆破 安全评价 模糊综合评价 层次分析法 demolition blasting sufety assessment fuzzy comprehensive evaluation analytical hienarchy process
  • 相关文献

参考文献1

  • 1陶松霖.爆破工程[M].北京:冶金工业出版社,1979..

共引文献1

同被引文献22

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部