摘要
文章对常吉高速9A合同段K93+520~720段采空区进行补充物探,提出相应的工程处治方案,并进行方案优化比选,最终采用开挖回填、强夯等综合的处治方案,取得良好效果。
This article takes the goal supplementary geophysical methods in the Chang-ji high-speed of 9A contracts of section K93+520+720, and puts forward corresponding engineering treatment programs,and furthermore optimizes the comparison and selection, finally summarize that excavation backfilling, tamping and so on integrated treatment programs can make good effect.
出处
《企业技术开发》
2010年第1期120-122,134,共4页
Technological Development of Enterprise
关键词
采空区
补充物探
土工格栅砂砾层-碎石桩
开挖回填-强夯
注浆
优化
goaf
supplementary geophysical
geogrid sandy gravel-gravel pile
excavation backfilling
dynamic compaction
optimization