井工开采对露井联采边坡稳定影响的塑性极限分析 被引量:12

Plastic limit analysis of stability of the open-pit slope subject to underground mining
下载PDF
导出
摘要 针对目前对露井联采边坡稳定研究方法的局限性和不足,首先根据露井联采边坡稳定的特征,基于塑性力学上限定理的边坡稳定极限分析方法,建立了井工长壁开采沉陷岩体的机动位移场,对沉陷岩体利用塑性极限分析方法建立功能方程。其次,利用该方法对安太堡南侧排土场下井工开采导致地表沉陷岩体进行了研究,分析了井工开采产生的沉陷对周围岩体特别是边坡岩体沉陷稳定和边坡稳定的影响,提出了露井联采边界参数应以井工开采工作面与边坡台阶的垂直安全距离为依据确定,其井工矿工作面开切眼位置应以Y=74160(与露天矿边坡水平距离为231 m)为界布置,才能保证其安全高度在105 m以上,实现安太堡南帮在露井联采下的安全稳定。 Aiming at the current limitations of the method for slope stability under open-underground mining,first of all,according to the characteristics of slope stability under open-underground mining and the limit analysis method for slope stability based on the upper bound theorem of plastic mechanics,a mobile displacement field of submerged rock under longwall mining is established,and in the meantime,the equation for submerged rock is obtained accordingly by using the method of plastic limit analysis.Secondly,the submerged rock of southern Antaibao open-pit slope under open-underground mining is studied by using the method,and the influence of subsidence caused by underground mining on vicinal rock and slope stability are analyzed.The following measures are proposed: the boundary parameter should be established depending on the vertical height of safe mining between mining face and slope bench.Accordingly,the mining face should be bounded by 71460(Y value) to ensure its vertical height of safe mining to be more than 105 meter,which can guarantee the stability of southern Antaibao open-pit slope under open-underground mining.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2010年第3期344-350,共7页 Chinese Journal of Geotechnical Engineering
基金 国家自然科学基金项目(50479001) 中煤能源集团公司攻关项目
关键词 露井联采 塑性力学上限定理 沉陷岩体 边界参数 垂直安全高度 open-underground mining upper bound theorem of plastic mechanics submerged rock boundary parameter vertical height of safe mining
  • 相关文献

参考文献15

  • 1刘勇.实施露井联合开采 加强资源回收[J].露天采矿技术,2004,19(4):11-12. 被引量:7
  • 2张永成,王长友.平朔矿区高产高效矿井设计经验浅析[J].煤炭工程,2006,38(8):5-7. 被引量:5
  • 3刘永忠.安家岭井工矿露天不采区采煤方法的论证选择[J].煤炭技术,2006,25(9):42-43. 被引量:1
  • 4贺佑国,王端武,白占平.国内外露天煤矿的发展趋势[J].中国煤炭,1998,24(8):13-17. 被引量:14
  • 5DONALD I B, CHEN Z Y. Upper bound solutions in geomechanics[C]// Computational Plasticity, Fundamentals and Applications Proc 4th Int Conf Comp Plas, Barcelona, Spain, 1995: 1797- 1808.
  • 6CHEN Z, WANG X, HABERFIELD C, YIN J, WANG Y. A three-dimensional slope stability analysis method using the upper bound theorem, part I: theory and methods[J].International Journal of Rock Mechanics and Mining Sciences, 2001, 38:369 - 378.
  • 7CHEN Z, WANG J, YIN J, WANG J, HABERFIELD C. A three-dimensional slope stability analysis method using the upper bound theorem, part II: numerical approaches, applications and extensions[J]. International Journal of Rock Mechanics and Mining Sciences, 2001, 38:379 - 397.
  • 8孙世国,蔡美峰,王思敬.露天转地下开采边坡岩体滑移机制的探讨[J].岩石力学与工程学报,2000,19(1):126-129. 被引量:89
  • 9PENG S S, LUO Y. Slope stability under the influence of ground subsidence due to longwall mining[J]. Mining Science and Technology, 1989(8): 89 - 95.
  • 10DAVIS E H, GUNN M J, MAIR R J, et al. The stability of shallow tunnels and underground openings in cohesive material[J]. Geotechnique, 1980, 30(4): 397 - 406.

二级参考文献20

共引文献144

同被引文献189

引证文献12

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部