溪洛渡水电站泄洪洞补气竖井开挖施工 被引量:5

Excavation of vent shaft of discharge tunnel of Xiluodu Hydropower Station
下载PDF
导出
摘要 以溪洛渡水电站右岸泄洪洞龙落尾补气竖井施工为例,针对施工过程中可能遇到的难点问题,提出了采用反井钻开挖竖井的施工方法,即先进行导井施工,然后扩孔进行全断面施工,扩孔开挖采取小药量乳化炸药爆破扩孔,并对开挖效果进行了分析,指出施工过程中的控制要点。结果表明:采用反井法钻进辅以爆破开挖方法有利于降低施工难度,加快施工进度。 Taking the excavation of vent shaft in tail section of discharge tunnel in right bank of Xiluodu Hydropower Station as an example,and considering the problems which may arise during construction,we propose the construction methods of shaft excavation construction,present the construction procedure,analyze the excavation effects and advance the key control points during construction.The results indicate that the construction difficulties can be reduced and the construction process can be accelerated in engineering practice.
作者 李红
出处 《人民长江》 北大核心 2010年第5期7-8,17,共3页 Yangtze River
关键词 右岸泄洪洞 补气洞 竖井开挖 溪洛渡水电站 discharge tunnel in right bank vent shaft shaft excavation Xiluodu Hydropower Station
  • 相关文献

同被引文献25

引证文献5

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部