输变电工程设计阶段造价控制的问题及对策 被引量:42

Problems and Countermeasures in Cost Control of Power Transmission Projects at the Design Stage
下载PDF
导出
摘要 基于输变电工程设计和管理工作的实践,论述了输变电工程设计阶段造价控制存在的一些问题,如基础设计保守,包括勘测设计费、前期工程费在内的工程其他费计费标准执行中存在不足,管理工作中存在加大可研阶段投资估算的倾向等。结合电网项目工程实际,从技术、管理、体制等方面分析提出了控制造价的相关措施,认为立足于技术、管理、体制三位一体,应在设计阶段建立"方案合理、投资可控、造价节省"的工程造价控制体系。 Based on the transmission project design and management practice, this paper discusses some problems existing at the design stage of power transmission projects, such as lack of innovation in the fundamental design, weakness in implementation of the other cost accounting standard for construction works such as survey and preliminary work, and tendency of inflated estimation of costs at the feasibility study stage. Based on the practice of power grid project execution, the paper presents some corresponding cost control measures in respect of technology, management and system innovation. It concludes that a project cost control system should be established at the design stage aiming at "rational plan, controllable investment and cost saving".
作者 梁跃清
出处 《能源技术经济》 2010年第2期23-28,共6页 Electric Power Technologic Economics
关键词 核准投资 限额设计 控制造价 设计阶段 proved investment quota design cost control design stage
  • 相关文献

参考文献19

二级参考文献55

共引文献216

同被引文献219

引证文献42

二级引证文献127

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部