5Lowe J, Whitworth T. Risk management and major construction projects, CIB W65(in conjunction with W92)[C] //International Symposium for the Organization and Management of Construction: Shaping Theory and Practice, Glasgow, Scotland, 1996.
6Frederick A. Entrepreneurial risk allocation in public-private infrastructure provision in South Africa [J]. South African Journal of Business Management, 2002, 33 (4): 29-40.
7Zhang X Q, Kumaraswamy M M(a). Procurement protocols for public-private parternered projects [J]. Journal of Construction Engineering and Management,2001,126 (3): 171-179.
8Zhang X Q, Kumaraswamy M M, Zheng W. Concessionaire selection for Build-Operate-Transfer tunnel projects in Hong Kong [J]. Journal of Construction Engineering and Management ,2002,128(2):155-163.
9Lemos T, Eaton D, Betts M. Risk management in the Lusoponte concession-a case study of the two bridges in Lisbon, Portugal[J]. International Journal of Project Management, 2004,22 ( 1 ):63-73.
10Li B, Akintoye A, Edwards P J. The allocation of risk in PPP/PFI construction projects in the UK [J].International Journal of Project Management, 2005, 23(1 ): 25-35.
3C. Walker, A. J. Smith, Privatized Infrast ructure. The Build Oper- ate Transfer[M]. Thomas Telford Publications, 1996.
4Patrick T I Lure. A seetoral review of risk associated with major infrastructure projects[J]. International Journal of Project Man- agement, 1999(2).
5A. Ng , Martin Loosemore. Risk allocation in the private provi- sion of public infrastructure [J]. International Journal of Project Management, 2007, (1).