期刊文献+

基于PLC的BESⅢ束流管冷却系统自动监控系统的设计 被引量:1

Design of Auto-monitoring and Control System of cooling system for BESⅢ Beam Pipe Based on PLC
下载PDF
导出
摘要 北京正负电子对撞机BEPCⅡ的二期改造工程为中国科学院重大项目改造工程,BESⅢ束流管冷却系统对BESⅢ束流管进行冷却,其中BESⅢ束流管冷却系统的自动监控系统负责BESⅢ束流管冷却系统的全面安全可靠运行。从工程设计的角度出发,介绍了自动监控系统的主要结构、工作原理、监控系统硬件选型及软件设计,并对系统的可靠性进行分析。运行结果表明,该监控系统满足BESⅢ束流管冷却系统的工艺要求,安全可靠。 According to the demands of the BEPC Ⅱ, a Key Programs of the Chinese Academy of Sciences, the auto-monitoring system of cooling system for BESⅢ Beam Pipe is designed to ensure the cooling system for BESⅢ Beam Pipe operating safety and reliability. From the point view of engineering design, the main structure, working principle, selection of hardware, design of software of the auto-monitoring system are introduced, and and the reliability is analyzed. The operation results indicate that the auto-moni- toring system is safe and reliable and meets the technical requirements of the cooling system for BESⅢ Beam Pipe.
出处 《核电子学与探测技术》 CAS CSCD 北大核心 2010年第1期124-129,140,共7页 Nuclear Electronics & Detection Technology
基金 中国科学院重大项目基金资助项目(KJ95T-03)
关键词 BESⅢ 束流管 PLC 冷却系统 自动监测 控制 BESⅢ, beam pipe, PLC, cooling system, auto-monitoring, control
  • 相关文献

参考文献3

二级参考文献13

  • 1孙瑜,王孟效.一种预测智能控制算法及其在多段通气优化控制中的应用[J].化工自动化及仪表,2003,30(1):31-35. 被引量:4
  • 2IHEP, Design Report of BEPCⅡ, May, 2002
  • 3IHEP, The BESⅢ Detector (DRAFT), June, 2002
  • 4Stuart D. Henderson, ''Synchrotron Radiation Background Simulation with SRGEN/SRSIM''
  • 5ZHANG De-Hong. Feasibility Study Report on Beijing Tau-Charm Factory, IHEP-BTCF Report-03, 1996
  • 6Hirayama H, Namito Y. Lecture Notes of EGS4 Course at KEK, KEK Internal 99-5, July 1999
  • 7Nelson W R, Hirayama H, Rogers W O, The EGS4 CODE SYSTEM, SLAC-Report-265, Dec. 1985
  • 8Henke B L, Gullikson E M, Davis J C. Atomic Data and Nuclear Data Tables, 1993, 54(2):181-342 (www-cxro.lbl.gov/optical-constants)
  • 9JIN Da-Peng et al. HEP & NP, 2003, 27(10):846 (in Chinese)(金大鹏等. 高能物理核物理, 2003, 27(10):846)
  • 10邵惠鹤.工业过程高级控制[M].上海:上海交通大学出版社,2003.30-31.

共引文献10

同被引文献5

  • 1沈维道.工程热力学[M].北京:高等教育出版社,1999.
  • 2BESm Collaboration. Design and construction of the BES m detector[J]. Nuclear Instruments and Methods in Physics Research A, 2010, 614(3): 345-399.
  • 3QIN Zhonghua, CHEN Yuanbo, SHENG Hua yi, et al. Beam test of a full-length prototype of the BES [II drift chamber with the readout electronics[J]. Nuclear Instruments and Methods in Physics Research A, 2007, 571(3): 612-621.
  • 4LIU Jianbei, QIN Zhonghua, WU Linghui, et al. A beam test of a prototype of the BES ]]I drift chamber in magnetic field[J]. Nuclear Instru- ments and Methods in Physics Research A, 2006, 557(2): 436-444.
  • 5ZHENG Lifang,JI Quan,WANG Li,LI xunfeng,XU Shaowang,DONG Sujun,ZHAO Libin,LIU Jianping.STRUCTURE DESIGN OF THE BEIJING SPECTROMETERⅢBEAM PIPE[J].Chinese Journal of Mechanical Engineering,2008,21(3):1-6. 被引量:3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部