南水北调中线京石段应急供水工程总干渠南起河北省滹沱河南侧古运河,北至北京市团城湖,线路总长度约307.422 km。本文主要通过对临时通水期沿线各建筑物监测资料成果分析,评估临时通水期各建筑物的安全状况,为运行管理单位掌控工程运行状态提供依据,并为类似工程的设计、施工提供参考。
The main channel length is about 307.422km for the emergency water supply project in Beijing-Shijiazhuang section of middle route of South to north water diversion,south to the ancient canal on the south of Hutuo river in Hebei province and north to Tuancheng lake in Beijing city.By analyzing the monitoring data results of these buildings along the channel during the temporary flowing water stage,the paper estimates the security of these buildings,which could provide the running basis for the operation and management apartment and the reference for the design and construction of the similar projects.