从凤翔路口—永寿高速公路段控制工程朝阳大桥为例,介绍了主桥空心薄壁墩总体施工方案,从施工准备、工作原理、翻模施工三方面具体阐述了空心高墩翻模施工内模整体提升技术,以期推广该技术的应用。
Taking the control engineering of Zhaoyang Bridge on the Fengxiang-Yongshou expressway for example,this paper introduces the overall construction scheme of the bridge's hollow-thin piers and elaborates on the whole-raising technology for internal mould in the construction of turning module of hollow high piers from three aspects: construction preparation,operational principle and the engineering of turnover formwork,so as to popularize the application of the technology.
出处
《山西建筑》
2010年第10期155-157,共3页
Shanxi Architecture
关键词
薄壁空心高墩
内模
整体提升
工作原理
hollow-thin high piers
internal mould
whole-raising
operational principle