摘要
以枫香桠隧道工程为例,结合工程地质条件,介绍了隧道施工过程中的监控量测内容及方法,并对监控量测数据进行了处理和分析,为该隧道的喷锚支护和二次衬砌的参数调整和施作时间的确立提供了依据。
Taking Fengxiangya tunnel as an example,the paper combining with the project's geological condition,introduces the contents and methods of the monitoring measurement in the tunnel construction process,analyzes the data of the monitoring measurement,and provides reference for the shotcrete-bolt support,the parameter adjustment and the identification of the construction time.