大断面富水煤系地层公路隧道开挖施工技术

The construction technology of large cross-section rich water coal measure strata highway tunnel excavation
下载PDF
导出
摘要 指出煤系地层施工是隧道尤其是大断面隧道施工中的难点,结合二广高速公路12合同段大崛坑2号隧道在富水煤系地层中的施工实践,详细介绍了三台阶上弧形导坑法在施工中的应用,为大断面隧道在同类地层施工提供了借鉴。 It pointed out that coal measure strata construction was difficult of tunnel,especially large cross-section construction.Combined with the construction practice of 12 contract segment large pitting No.2 tunnel of Er-Guang express highway in rich water coal measure strata,the three-pedestal sit upper arc pilot tunnel method application in construction was detail introduced,which provided reference for large cross-section tunnel construction in similar strata.
作者 张金光
出处 《山西建筑》 2010年第10期303-304,共2页 Shanxi Architecture
关键词 三台阶上弧形导坑法 施工技术 大断面 煤系地层 three-pedestal sit upper arc pilot tunnel method construction technology large cross-section coal measure strata
  • 相关文献

参考文献2

二级参考文献3

共引文献420

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部