摘要
介绍了辽宁(营口)沿海产业基地民生路大桥,斜拉桥主塔施工测量控制过程,主要包括索导管、劲性骨架、模板定位等。
The construction measurement Minsheng Road Bridge in Liaoning (Yingkou) skelton, templet positioning and etc. control procedure for the main tower Coastal Industrial Base is introduced, of the cable stayed bridge - including anchor tube, steel
出处
《北方交通》
2010年第3期71-72,共2页
Northern Communications
关键词
斜拉桥
测量控制
索导管
Cable stayed bridge
Measurement control
Anchor tube