泥沙问题是三峡水库的关键技术问题,三峡工程泥沙专家组结合三峡水库的运用实践和大量原型观测成果,跟踪进行了研究分析,并提出了有关三峡水库设计和运行的建议及一系列新认识。
The sediment is a key technical problem of Three Gorges Reservoir.After considering the reservoir operation practice and a large number of prototype monitoring results,the Export Group on Sediment Research of Three Gorges Reservoir has carried out continue study on the sediment problems.Proposals on design and operation of reservoir and some new knowledge are presented.