摘要
介绍了三峡右岸地下电站施工期爆破振动监测和边墙变形监测的情况,总结了相关规律,通过调整爆破参数、合理安排支护时机和支护手段等施工措施,确保了大型地下洞室群施工开挖的安全,可供类似地下工程的施工参考。
The blasting vibration and sidewall deformation monitoring of Three Gorges underground power station in construction period are introduced herein.After summed up the laws,some measures such as blasting parameters adjustment,reasonable arrangements for supporting timing and means are used for the excavation of large-scale underground cavern.The safety of construction is ensured.
出处
《水力发电》
北大核心
2009年第12期48-49,共2页
Water Power
关键词
地下厂房
施工期
安全
三峡工程
underground power station
construction period
safety
Three Gorges Project