摘要
文章着重介绍了山东泰安抽水蓄能电站大型混流可逆式水泵水轮机各主要部件安装的工艺特点,以及施工中对难点问题的解决方法,为国内同类机型的安装提供了有益的参考。
The paper introduces installation process of each principal part of large-scale flow-mixing reversible pump-turbine of Tai'an pumped storage hydropower station in Shandong province,as well as the solution of problem questions during construction,it provides instructive reference for the installation of domestic same units.
出处
《青海电力》
2009年第A02期10-14,共5页
Qinghai Electric Power
关键词
抽水蓄能电站
大型混流可逆式
水泵水轮机
安装工艺
pumped storage hydropower station
large-scale flow-mixing reversible
pump-turbine
installation process