摘要
文章介绍了长江三峡水利枢纽工程混凝土生产系统规模、场地布置、设备选型、工艺流程、7℃预冷混凝土一次、二次制冷车间、大坝冷水厂冷量的配置以及风、水、电的配置,粗、细骨料贮运分级工艺以及主要的土建、结构、设备的施工及安装,为大型水电站的混凝土生产系统布置积累了经验。
The paper introduces Sanxia power station concrete production system's scale,site arrangement,equipment selection,technological process,7℃ pre-cooling concrete first and secondary cooling workshop's configuration,aggregates storage transportation craft and main civil,equipment construction and installation,it accumulates experience for large hydropower station's concrete production system arrangement.
出处
《青海电力》
2009年第A02期41-45,58,共6页
Qinghai Electric Power
关键词
三峡电站
混凝土生产系统
布置
安装
Sanxia power station
concrete production system
arrangement
installation