期刊文献+

P.C.连续刚构桥施工过程的仿真分析 被引量:8

SIMULATION FOR CONSTRUCTION PROCESS OF P.C. CONTINUOUS RIGID FRAME BRIDGE
原文传递
导出
摘要 现代P.C.(预应力混凝土)连续刚构桥受力复杂,成桥应力同施工过程相关。根据其结构及受力特点,提出用实体退化单元建立P.C.连续刚构桥施工过程分析的三维模型;将预应力筋作为结构的一部分,用等效节点荷载模拟预应力的张拉效应;用三参数粘弹性模型模拟混凝土徐变效应;提出了阶段模型应力的处理方法。以一实际刚构桥为对象对该方法进行了应用研究。结果表明:P.C.连续刚构桥在恒载状态下,成桥应力和挠度与施工过程密切相关,常用的一次成桥方式获得的成桥应力和挠度与实际有较大偏差。 For a modern P.C.(prestressed concrete) continuous rigid frame bridge,its stress state is complicated,and affected by construction process.To simulate its structural behavior during construction process,degenerate solid elements were used and a three-dimensional model was set up.Taking prestressed reinforcement as a part of structure,the equivalent nodal load was obtained to calculate the effect of tensioning bars.A three-parameter viscoelasticity model was adopted to simulate the concrete creep.A processing method for internal stress of stage model was developed.A P.C.continuous rigid frame bridge was employed for the case study.The results show that the stresses and deflections of P.C.continuous rigid frame bridge under dead loads are closely related to construction process,and that the stresses and deflections obtained with commonly-used method which ignores the effect of construction process have large deviation.
出处 《工程力学》 EI CSCD 北大核心 2010年第3期101-106,共6页 Engineering Mechanics
关键词 连续刚构桥 仿真分析 实体退化单元 阶段模型 徐变效应 continuous rigid frame bridge simulation analysis degenerate solid element stage model creep effect
  • 相关文献

参考文献8

  • 1雷俊卿,王楠.预应力混凝土连续刚构桥施工监测与仿真分析[J].铁道学报,2006,28(2):74-78. 被引量:38
  • 2王运涛,王维红,陈宇峰,顾安邦.预应力连续刚构桥施工空间仿真分析[J].重庆交通大学学报(自然科学版),2007,26(5):21-24. 被引量:4
  • 3Yamaguchf, Eiki, Chaisomphob. Stress concentration and deflection of simply supported box girder including shear lag effect [J]. Structural Engineering and Mechanics, 2008, 28(2): 207-220.
  • 4徐兴 凌道盛.实体退化单元系列.固体力学学报,2001,22:1-1.
  • 5凌道盛,张金江,项贻强,徐兴.虚拟层合单元法及其在桥梁工程中的应用[J].土木工程学报,1998,31(3):22-29. 被引量:70
  • 6林同炎,Ned H.预应力混凝土结构设计[M].第3版.北京:中国铁道出版社,1983.
  • 7Bonet J, Wood R D. Nonlinear continuum mechanics for finite element analysis [M]. New York: Cambridge University Press, 1997.
  • 8Rendell R W, Ngai K L, Fong G R, Fee A F, Bankert R J. Nonlinear viscoelasticity and yield: Application of a coupling model [J]. Polymer Engineering and Science, 1987, 27(1): 2-15.

二级参考文献9

  • 1邓雪涛,曾德荣,刘宏伟.不对称变截面箱梁桥在悬臂施工阶段扭转控制分析[J].重庆交通学院学报,2007,26(3):24-28. 被引量:2
  • 2团体著者,嘉王公路北郊河特大桥荷载试验研究报告,1996年
  • 3周世军,土木工程学报,1996年,29卷,4期
  • 4团体著者,北郊河大桥施工图,1994年
  • 5徐兴,Commun Numer Methods Eng,1993年,9卷,15页
  • 6张双寅,复合材料结构的力学性能,1992年
  • 7团体著者,公路桥涵设计规范,1989年
  • 8JTGD62-2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].[S].,..
  • 9雷俊卿.桥梁悬臂施工与设计[M].人民交通出版社,1999..