1Cheng-Min Feng, Tsai-Chu Wang.Highway Emergency Rehabilitation Scheduling in Post-Earthquake 72 Hours[J].Journal of the Eastern Asia Society for Transportation Studies,2003,.5.
8Yongshuang Zheng, Baoding Liu. Fuzzy Vehicle Routing Model with Credibility Measure and Its Hybrid Intelligent Algorithm[J]. Applied Mathematics and Computation,2006, 176.
2Chiang, W., L. Jin. The Counter Measures for Urbanization Integrated Disaster in China [M]. Peking: Chinese Construction Industry Publisher, 1992:94
3Werner, S.D., J.B. Jernigan, C.E. Taylor. Howard H.M. Hwang. Seismic Vulnerability Assessment of Highway Systems [J]. The Quarterly Publication of NCEER, 1995, 9(4) :2-4
4Nojima, N., M.Sugito. Simulation and evaluation of post-earthquake functional performance of transportation network [R]. Japan: Department of Civil Engineering, Gifu University, 2000:2-7
5Kuwata, Y., S.Takada. Effective Emergency Transportation for Saving Human Lives [J]. Natural Hazards, 2004,33(1): 23-46
6Chang, S.E., N.Nojima. Measuring Post-Disaster Transportation System Performance: The 1995 Kobe Earthquake in Comparative Perspective [J]. Transportation Research part A, 2001,35:475-494
7Bodin L,Golden B, Assad A,and Ball M.Routing and scheduling of vehicles and crews:the state of the art[J]. Computer and Operation Research,1983;10:62~212.
8Gillet B,Miller L. A heuristic algorithm for the vehicle dispatch problem[J]. Operational Research,1974,22:340~349.
9Lin S.Computer solutions of the traveling salesman problem[J]. Bell System Technology Journal,1965,44:2245~2269.
10Teodorovic D,Pavkovic G. A simulated annealing technique approach to the vehicle routing problem in the case of stochastic demand[J]. Transportation Planning and Technology,1992,16:261~270.