期刊文献+

船坞围堰爆破拆除过流控制研究及工程应用 被引量:4

OVERFLOW CONTROL STUDY AND ENGINEERING APPLICATION ABOUT DOCK COFFERDAM BLASTING DEMOLITION
下载PDF
导出
摘要 船坞围堰爆破拆除采用围堰内不充水爆破方案时,必须控制过流。本文针对围堰爆后易发生过流的特点,从爆破参数设计、钻孔形式、起爆技术及爆破时潮位选择等方面对过流控制措施进行论述。此控制措施在工程实践中应用表明是有效的,可供类似的爆破工程参考。 Overflow must be controlled if there isn't water in the dock, when the dock cofferdam is removed by blasting. Control measures about overflow had been discussed in detail in view of blasting parameter design, form of drill hole, initiation technique, and selection of sea level during blasting. The control measures were proved to be valid by the engineering practice, and had reference value to similar projects in design and construction of blasting.
出处 《工程爆破》 北大核心 2010年第1期52-54,共3页 Engineering Blasting
关键词 船坞围堰 爆破拆除 过流控制 起爆技术 安全防护 Dock cofferdam Blasting demolition Overflow control Initiation technique Safety protection
  • 相关文献

参考文献3

二级参考文献4

  • 1张中雷,管志强,蒋昭镳,李辰发.舟山马峙岛(30+10)万吨级船坞围堰拆除爆破技术[J].工程爆破,2006,12(1):29-34. 被引量:6
  • 2.中华人民共和国标准.爆破安全规程(GB6722-2003)[S].北京:中国标准出版社,2004..
  • 3郑家志,黄志强.近代爆破理论与实践[M].武汉:中国地质大学出版社,1993.
  • 4[美]U·兰格福斯,B·基尔斯特略 著,《岩石爆破现代技术》翻译组.岩石爆破现代技术[M]冶金工业出版社,1983.

共引文献33

同被引文献17

引证文献4

二级引证文献5