摘要 拟建的新街-恩格阿娄铁路穿过水土流失强度大的鄂尔多斯剥蚀丘陵区和毛乌素沙漠区,铁路建设的施工过程会增大沿线的水土流失量。本研究采用模式预测法对施工期内不同的施工单元和地类的水土流失量进行了估算。结果表明,工程建设区域内原地貌背景水土流失量为3.79×104t,在施工期间如果不采取任何防护措施,工程建设可能造成的水土流失量为7.47×104t,可能造成的新增水土流失量为3.69×104t,主体工程新增的水土流失量最大,达到2.4×104t,占可能新增的水土流失总量的65%左右,取土场次之,占28%左右,施工场地及营地新增的水土流失量最小,不到新增水土流失总量的1%。在水土流失防治上,重点防治区段是主体工程区、取土场和临时堆土区,本文对不同的施工单元提出了包括工程措施、植物措施和临时防护措施在内的水土流失防治对策。 The planned Xin Jie-En Ge A Lou railway construction project passes through E Er Dous stripped hills and Mao Wu Su dessert area with high intensity of water and soil erosion,and construction process can increase water and soil amount along railway.The water and soil amount of different construction units and land types of construction period are calculated with mode estimation method.The different counter measures of water and soil prevention and control are put forward according to different construction units,including engineering measures,plantation measures and temporary protection measures.
出处 《环境与发展》 2010年第1期28-33,共6页 Environment & Development
关键词 新街-恩格阿娄铁路 水土流失 荒漠草原 Xin Jie-En Ge A Lou railway water and soil erosion desert grassland
  • 相关文献

参考文献10

二级参考文献34

共引文献28

同被引文献23

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部