摘要 巴贡水电站地处降雨量充沛的热带岛屿,枢纽中有1座202 m高的混凝土面板石坝、陡槽溢洪道、放水隧洞和水电厂。溢洪道下泄流量大,落差大,泄水冲沟对施工干扰大,施工道路及设备布置困难。针对施工中的难点制定了施工方案,重点论述其中的道路规划、设备布置、模板选型及混凝土浇筑方案等。 The Bakun Hydropower Station is located at a tropical rainy island, and is consisted of a 202 m high CFRD, a long chute-spillway at chute-spillway bring abo left-bank, a diversion tunnel and a power plant. The gullies washed out by discharge flow from ut serious disturbances to the general layout of construction equipment and construction roads. In the light of these difficulties, a careful construction scheme is worked out, the focal points are on the layout of construc- tion roads and construction equipment, the selection of formwork, and the concrete placing-curing works etc.
作者 杜正宏
出处 《水电与新能源》 2010年第2期17-19,共3页 Hydropower and New Energy
关键词 泄槽溢洪道 陡坡道路 模板 设备布置 shute-spillway steep construction road formwork layout of equipment
  • 相关文献

参考文献3

二级参考文献6

  • 1马来西亚巴贡水电站工程业主招标文件(Employer's Requiremerits - Bakuta Hydroelectric Project, Package CW2 - Main Civil Works, Volume 2 of 7, Books 1 and 2 )[Z]. 马来西亚,2001.
  • 2马来西亚巴贡水电站工程概念设计报告( Bakun Hydroelectric Project, Package CW2 - Main Civil Works, Concept Design Brief,MCHJV (prepared by SDE - NIDRI Consortium ), December 2002) [Z]. 西安:西北勘测设计研究院,2003.
  • 3刘昌,韩建设,杨贤,等.马来西亚巴贡水电站工程地质报告[R].兰州:西北勘测设计研究院,2004.
  • 4巨江,杨纪元,刘少斌,等.马来西亚巴贡水电站1:50溢洪道水工模型试验报告[R].西安:西北勘测设计研究院,2005.
  • 5王康柱,陈炀,卞全.马来西亚巴贡水电站溢洪道设计准则[R].西安:西北勘测设计研究院,2003.
  • 6韩立,孙双科,张志恒,等.马来西亚巴贡水电站溢洪道掺气减蚀设施咨询意见[R].西安:西北勘测设计研究院,2004.