丹江口大坝加高工程完工后,枢纽自备防汛电厂的水头将大幅度提高,给机组的安全稳定运行带来不利的影响。对此影响进行了分析,并对机组增容改造提出了几点建议。
The working head of the Danjiangkou small hydropower plant ( provided for by a large margin after the dam heightening work is completed. It is unfavourable to the units. Therefore, some viewpoints on capacity expanding of the hydro-generating units flood prevention) will be raised operation of the hydro-generating are proposed.
出处
《水电与新能源》
2010年第2期36-37,共2页
Hydropower and New Energy
关键词
丹江口枢纽
大坝加高
自备防汛电厂
增容改造
Danjiangkou Hydroproject
dam heightening
hydropower plant for flood prevention
reform for eapacityexpanding