丹江口自备防汛电厂增容改造的建议

Suggestion on capacity expanding of Danjiangkou floodprevention hydropower plant
下载PDF
导出
摘要 丹江口大坝加高工程完工后,枢纽自备防汛电厂的水头将大幅度提高,给机组的安全稳定运行带来不利的影响。对此影响进行了分析,并对机组增容改造提出了几点建议。 The working head of the Danjiangkou small hydropower plant ( provided for by a large margin after the dam heightening work is completed. It is unfavourable to the units. Therefore, some viewpoints on capacity expanding of the hydro-generating units flood prevention) will be raised operation of the hydro-generating are proposed.
出处 《水电与新能源》 2010年第2期36-37,共2页 Hydropower and New Energy
关键词 丹江口枢纽 大坝加高 自备防汛电厂 增容改造 Danjiangkou Hydroproject dam heightening hydropower plant for flood prevention reform for eapacityexpanding