摘要
介绍了白莲河地下厂房围岩地质情况,重点论述岩锚梁锚杆注浆方式的选择、锚杆注桨试验、岩锚梁锚杆施工工艺及质量控制措施。
The geologic condition of the surrounding rock of Bailianhe underground powerhouse is described in brief, selection of grouting pattern, the grouting test of the anchor bars, the construction process and the quality control measures of the anchored rock runway are described as focus
出处
《水电与新能源》
2010年第2期61-62,71,共3页
Hydropower and New Energy
关键词
岩锚梁
锚杆
施工工艺
地下主厂房
anchored rock runway
tension anchor bar
construction process
underground powerhouse