移动式脚手架体系选型及结构分析 被引量:5

Selection and Analysis of Mobile Scaffold System
下载PDF
导出
摘要 针对目前大型空间结构场地面积较大、内部净空较高的施工特点,提出了移动式脚手架体系,介绍了移动式脚手架的支承架体、施工平台、轨道的结构构成。通过对支承体系的整体建模并考虑结构的几何非线性,分析了结构整体稳定性。数值分析和工程实践表明,该体系强度高,整体稳定性好。对施工场地面积较大、内部净空较大工程,该体系具有节约成本、加快施工进度的优点。 Mobile scaffold system was put forward according to construction conditions of large space structures which areas is bigger and the clearance is higher. The configurations of its supporting system and upper platform were introduced in detail. Integral stability was analyzed by modeling the whole structure and taking into account geometric nonlinear. The result of numerical analysis and the practices of project shows that carrying capacity of the mobile scaffold system is higher and integral stability is better. The mobile scaffold system is suitable for the project which area is bigger and clearance is higher. It can reduce the cost of construction and speed up the progress.
出处 《施工技术》 CAS 北大核心 2010年第3期44-47,共4页 Construction Technology
关键词 移动脚手架 上行式 下行式 P-Δ效应 几何非线性 整体稳定 mobile scaffold upgoing mobile type downgoing mobile type P-delta effect geometric nonlinear integral stability
  • 相关文献

参考文献7

  • 1秦敬伟,杨庆山,赵红军.国家游泳中心内部气枕安装用脚手架体系的选型及分析[J].施工技术,2008,37(10):100-102. 被引量:5
  • 2.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003..
  • 3BS EN 12811-1 : 2003 Temporary works equipment-part 1: scaffolds-performance requirements and general design [ S ]. 2003.
  • 4BS EN 12811-2 : 2004 Temporary works equipment-part 2: information on material [ S ]. 2004.
  • 5BS EN 12811-3: 2002. Temporary works equipment-part 3: load test[ S]. 2002.
  • 6BS EN 12810-1 : 2003 Facade scaffolds made of prefabricated components -partl: products specification[ S]. 2003.
  • 7BS EN 12810-2:2003 Facade scaffolds made of prefabricated components -part 2 : particular methods of structural design [ S ]. 2003.

二级参考文献7

  • 1梁培新,郭正兴.扣件式钢管移动脚手架施工的关键技术[J].施工技术,2007,36(2):38-39. 被引量:3
  • 2BS EN 12811-1:2003 Temporary works equipment-patti: scaffoldsperformance requirements and general design[ S].
  • 3BS EN 12811-2:2004 Temporary works equipment-part2: information on material[ S].
  • 4BS EN 12811-3:2002 Temporary works equipment-part3: load test [S].
  • 5BS EN 12810-1:2003 Facade scaffolds made of prefabricated components -part1 : products specification[ S].
  • 6BS EN 12810-2:2003 Facade scaffolds made of prefabricated components -part2: particular methods of structural design[S].
  • 7中华人民共和国建设部.GB50017-2003钢结构设计规范[S].北京:中国计划出版社,2003.

共引文献672

同被引文献28

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部