摘要
结合珠海某层高12m高大模板工程实例,详细阐述该工程在材料选用、扣件式钢管高支撑架设计验算、施工及构造措施、安装拆除要求以及施工监测方案。通过实践检验,模板与其支架安全、可靠,保证了工程的施工质量及施工安全。
Based on a project in Zhuhai,it is introduced a 12 m high scaffolding formwork support including material selection,bearing capacity calculation,installation and dismantlement procedure,details of construction,inspection procedure,etc.The practice verified that formwork and its support had no problems that guaranteed the quality and safety of the project.
出处
《钢结构》
2010年第3期67-71,共5页
Steel Construction
关键词
扣件式钢管脚手架
高支模
设计
施工
监测
steel pipe and fastener scaffolding system
high formwork support
design
construction
inspection