摘要
沙湾水电站尾水渠工程是迄今为止亚洲水电站建设之中设计长度最长的尾水渠。介绍了砼面板防裂配合比设计、施工质量控制、滑模的设计和配重计算、模体的加工和安装以及模板的支撑和操作等,为同类施工提供了借鉴。
So far, the tailrace engineering of Shawan Hydropower Station is the one with longest design length in the construction of Asian hydropower stations. This paper mainly introduces the anti-cracking concrete panel design, construction quality control, sliding formwork design and weight calculation, processing and installation of die body, and the support and operation of the template, etc. which provides the reference for the similar construction.
出处
《科技情报开发与经济》
2010年第6期149-152,共4页
Sci-Tech Information Development & Economy
关键词
沙湾水电站
尾水渠
砼面板
施工质量
滑模设计
Shawan Hydropower Station
tailrace
concrete panel
construction quality
sliding formwork design