摘要
深圳市公明污水处理厂工程近期设计规模为10×104m3/d,远期为20×104m3/d,工艺流程采用多模式A2/O工艺,出水质量执行一级A标准。在工程设计中,借鉴了相关工程的设计经验,对各构筑物的设计参数进行了优化,并介绍了主要构筑物及设计参数。
The recent design scale of Shenzhen Gongming Sewage Treatment Plants is 10 × 104 m3/d,while the future one is 20×104 m3/d.The multi-A2/O process is adopted and the outflow quality must meet Standard Class A.During the project design,thinking about relative projects experience,the design parameters of all structures are optimized and introduced briefly.
出处
《中国市政工程》
2010年第1期34-37,共4页
China Municipal Engineering
关键词
污水处理厂
A2/O工艺
脱氮除磷
工程设计
sewage treatment works
A2/O process
denitrification and phosphorus removal
project design