1LEE W B.Digital factory-building a technology show case for teaching and research in digital manufacturing for Hongkong and greater metropolitan[R].Earmark Provision for Special Projects, 1999.
2Shams-ur Rahman.Theory of constraints- A review of the philosophy and its applications. International Journal of Operations & Production Management, 1998.
2SHAMS-UR RAHMAN. Theory of constraints- A review of the philosophy and its applications[J]. International Journal of Operations & Production Management, 1998,18(4):336-355
3SATISH MEHRA,R ANTHONY INMAN, GREGORY TUITE. A simulation-based comparison of TOC and traditional accounting performance measures in a process industry [J]. Journal of Manufacturing Technology Management,2005,16 ( 3): 328-342.
4WU H.-H,YEH M L.. A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows[J ]. International Journal of Production Research, 2006,144(5) : 883-902.
5RICHARD BABIKIAN,MARIJKE SANDERS. Application of a constraint based production line management system for semiconductor manufacturing [C]. Semiconductor Manufacturing Conference Proceedings,1997 IEEE International Symposium.
6RAYMOND A.RERICK. Fab 6 Pipeline constraint management implementation at Harris Semiconductor Corp [J].Microeletronics Joural, 1997,28(2).2:8-9.
7ROBERT E MURPHY, JR CHRISTOPHER R. Dedera. Holistic Toc for Maximum profitability.1996 IEEE/SEMI Advanced Semiconductor Manufacturing Conference [ C ]. 1996.
5Rotab Khan M R,Hurlock S C,Leaf GAV.Computer simu-lation of production systems for woven fabric manufacture[J].Computers&Industrial Engineering,1999(12):745-756.
6Anglani,A Grieco,M Pacella,et al.Object-oriented modelingand simulation of flexible manufacturing systems:a rule-based procedure[J].Simulation Modeling Practice and Theo-ry,2002,(10):209-234.