中板厂热处理车间托梁拔柱设计

The jack beam and pulled apart column design in core factory heating process plant
下载PDF
导出
摘要 介绍了工业厂房托梁拔柱的设计内容,包括柱子的加大截面加固法,托架的设计,柱间支撑及屋面支撑的布置,施工工序安排等,从而使得拔柱在不破坏屋顶围护结构的情况下在短时间内得以实施,最大程度的减少了施工工作量,实践证明加固方案合理,经济,可为同类设计参考。 The design content of industrial plant jack beam and apart column was introduced, including column cross-section increasing method, jack beam design, inter column support and floor support layout, construction procedure adjustment etc. therefore made apart column can be implemented in the short time without damaging floor maintenance structure, which reduced construction work amount at the maxi- mum extent. The practice proved that the reinforcement planning was rational, economical and can be referenced for similar design.
作者 蒋理 江科文
出处 《山西建筑》 2010年第11期85-86,共2页 Shanxi Architecture
关键词 拔柱 托架 加固 单偏压 双偏压 节点设计 pulled apart column, jack beam, reinforcement, single bias, double bias, joint design
  • 相关文献

参考文献4

二级参考文献3

共引文献3063

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部