摘要
结合具体工程实例,介绍了预应力管桩静压法施工在河北唐山京唐港地区的应用,具体阐述了预应力管桩静压法施工的流程及步骤,并针对施工过程中出现的问题提出了相应的解决办法,以期促进该技术在河北地区的推广和应用。
Combing exact project, it introduces the application of prestressed pipe static press in Hebei Tangshan harbor and further elaborates the process and step of prestressed pipe static press construction. It also proposes related solution method in the construction progress, so as to spread and develop the technology in Hebei district.
出处
《山西建筑》
2010年第11期122-123,共2页
Shanxi Architecture
关键词
预应力管桩
静压法
工艺流程
泥浆护壁方案
prestressed pile foundation, static press method, art progress, earth magma protective wall scheme