期刊文献+

铁路客运专线连续梁桥的线形监控技术 被引量:6

The linear monitoring technology of continuous bridge of passengers dedicated railway
下载PDF
导出
摘要 以广深港客运专线广深段屏山涌特大桥跨龙湾水道悬臂连续梁桥的线形监控为例,介绍了线形监测影响因素和监控过程,通过监控结果分析指导施工过程,并对桥梁线形监控提出相应建议,为今后同类工程的线形监控提供了有益借鉴。 With the projecting beam continuous bridge linear monitoring of Pingshanyong super large Bridge over Longwan water channel of Guang-Shen-Gang passengers dedicated railway from Guangdong to Shenzhen segment as example, the linear monitoring influencing factors and monitoring process were introduced. Through monitoring result to guide construction process, and propose corresponding suggestions for bridge linear monitoring, which provided favorable reference for future similar engineering.
作者 贾明伦
出处 《山西建筑》 2010年第11期323-325,共3页 Shanxi Architecture
关键词 客运专线 连续梁桥 线形监控 passengers dedicated railway, continuous bridge, linear monitoring
  • 相关文献

参考文献1

二级参考文献8

共引文献17

同被引文献15

引证文献6

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部